76AEC021 AEC Matador Wrecker Crouch Recovery option-set-021 14 metal castings
Description
14 metal castings
all other ESU decoders profit from the LokProgrammer’s versatility
Built in the 1950s these 35t GLW (Gross Laden Weight) wagons served the railways for many years transporting iron ore from British iron ore mines for steel production
a 17th-century cylindrical stone tower windmill that was built outside the village of Chesterton
Fuselage length: 125mm
76AEC021 AEC Matador Wrecker Crouch Recovery option-set-021 14 metal castingsCrouch Recovery has become a firm favourite on Oxford commercial recovery trucks and the fleet grows even more with their bright orange colour scheme making a welcome return on an AEC Matador Wrecker. The company began in 1948 when David and Barbara Crouch ran a local filling station and recovery service. Three generations on and Crouch has grown into one of the biggest and fastest growing recovery operations in the UK and still family run. As they
Exchange/Return Notes
- We offer a 30-day return/exchange service after receiving.
- Final sale items are not eligible for returns or exchanges.
- To process your return/exchange, please contact us at [email protected]
- Please click here for more details>>> Return & Exchange Policy
























